MINIMUM QUALIFICATIONS:
Education: Possession of a bachelor's degree in engineering from an accredited college or university.
Experience: Seven (7) years of experience in professional engineering. ** Two (2) years of this experience must include reviewing Critical Path Method schedules for large-scale and/or mega construction projects. (e.g. $50 million to $1 billion projects involving both public and private stakeholders)
**This statement contains a SELECTIVE QUALIFICATION, which is more focused in scope than the Minimum Qualifications for this classification. Selective Qualifications are utilized when the position requires specific or additional bona fide occupational qualifications (knowledge, skills, and abilities). No substitutions are allowed for a Selective Qualification.
Your placement on an eligible list may be based solely on the contents of your application; therefore, it is essential that you provide complete and accurate information. Please include all relevant experience on your application. This includes but is not limited to, full or part-time, volunteer, military, acting capacity, or any other experience that is relevant to the position you are applying for.
If you have held more than one (1) position at the same employer, please list each position that you held and the length of time that you held each position.
Notes:
1. Additional work experience in professional engineering, or in technical engineering at the journey level or above, may be substituted on a year for year basis for the required education.
2. Possession of a Master's Degree in engineering may be substituted for one year of the non-supervisory experience.
3. Persons currently registered as Professional Engineers in the State of Maryland, or in a state with comparable requirements, are considered to have met the education requirements.
1. Employees in this class may be required to possess a Professional Engineer, Land Surveyor, or Property Line Surveyor License.
2. Employees in this classification may be assigned duties which require the operation of a motor vehicle. Employees assigned such duties will be required to possess a motor vehicle operator's license valid in the State of Maryland.
APPLICATION PROCESS:
Please apply online at https://www.governmentjobs.com/careers/mdotmd. RESUMES CANNOT BE SUBSTITUTED FOR THE ONLINE EMPLOYMENT APPLICATION. Paper applications (Form DTS-1) will not be accepted for this recruitment.
Please be advised that the State of Maryland is dedicated to a drug-free workplace, and as a result, employees are subject to the State's Substance Abuse Policy to include possible drug testing. Selected candidate(s) may be subject to background and reference checks.
The incumbent in this position will not be a member of a covered bargaining unit.
For education obtained outside the U.S., at the time of application, you are required to provide proof of the equivalent American education as determined by a foreign credential evaluation service, such as the National Association of Credential Evaluation Services
(http://www.naces.org) or World Education Services: International Credential Evaluation
(https://www.wes.org/). This must be submitted as an attachment with the application of the
position in which you are applying.
The Maryland Transportation Authority is not sponsoring new employees in application of the H-1B Visa or providing an extension of an existing H-1B Visa at this time due to budgetary constraints. All applicants must be legally authorized to work in the United States under the Immigration Reform and Control Act of 1986. Federal regulations prohibit H1B Visa candidates from paying sponsorship fees, all sponsorship fees must be assumed by the potential employer.
WE ARE AN EQUAL-OPPORTUNITY EMPLOYER. MDTA does not discriminate based on age, ancestry, color, creed, gender identity or expression, genetic information, marital status, mental or physical disability, national origin, race, religious affiliation, belief or opinion, sex, or sexual orientation.
MDOT has various careers for people of all experiences, backgrounds, and abilities who come together to contribute to one mission - connecting our customers to life's opportunities. Join us in serving our Maryland residents, visitors, and businesses!
Reasonable Accommodations for persons with disabilities will be provided upon request.
Appropriate auxiliary aids and services for qualified individuals with disabilities will be provided upon request. Please notify us in advance. MD Relay Service Number 1-800-735-2258 (TTY Number: 711). Bilingual applicants are encouraged to apply.
Issue Date: 04/08/2024